Project 3 – Golden Wish

The grounding damage of m/v Golden Wish (ex. Ken Explorer) caused at the vessel permanent hogging 760 mm, twisting clockwise 65 mm, a deformation at the main engine foundation, also the rudder post had cropped and missed.

The repair was made in Hellenic Shipyards dry-dock with prefabricated steel blocks internally painted with the final paint altogether the necessary pipe lines. The renewed steel weight was 2.335 tons and required ninety eight (98) running days to complete all the repairs. The only competitor for the contract had quoted 340 days.